[TA] Teknik Sipil Collection home page

Browse
Subscribe to this collection to receive daily e-mail notification of new additions RSS Feed RSS Feed RSS Feed
Collection's Items (Sorted by Submit Date in Descending order): 161 to 180 of 230
Issue DateTitleAuthor(s)
2017-08-23PENGARUH PENAMBAHAN SERAT IJUK TERHADAP KUAT LENTUR BETONLumingkewas, Riana Herlina; Hakim S., Ridwan Salim
2023-02-23ANALISA PERBANDINGAN BIAYA DAN WAKTU PENGGUNAAN BEKISTING MULTIPLEK (PLYWOOD) TERHADAP BEKISTING ALUMINIUM PADA BANGUNAN BERTINGKAT TINGGI (Proyek Studi : Apartemen Kingland Avenue)Yanita, Rachmi; Ramadhan, Rizqi Nur
2023-04-14PENGARUH CACAHAN PLASTIK SEBAGAI BAHAN PENAMBAH ABU BATU TERHADAP KUAT TEKAN PAVING BLOCKHerlina L., Riana; Setyadi, Yudhistira Pratama
2023-03-17PENERAPAN SOP JAYA CM PADA PROYEK GEDUNG UNIVERSITAS BUNDA MULIAMochtar, Krishna; Hidayat, Siti Khadijah
2023-06-12PEMODELAN BANGKITAN PERJALANAN PADA PERUMAHAN GRIYA ASTER DI KECAMATAN LEGOKUpa, Verdy Ananda; Putra, Dhiaz Mulyana
2023-09-20Pengaruh Penambahan Kapur dan Semen Terhadap Daya Dukung dan Potensi Pengembangan Tanah Lempung LunakUpa, Verdy Ananda; Ardiansyah, Prayoga
2023-09-01ANALISA STRUKTUR BAJA DAN EFEKTIVITAS AUTOMATIC CLIMBING SYSTEM PADA BEKISTING COREWALL DI PROYEK THAMRIN NINE PHASE 2 – JAKARTAYanita, Rachmi; Wijaksono, Aryo
2023-02-13STUDI KELAYAKAN PEMBANGUNAN FLYOVER DI SIMPANG CISAUK DITINJAU DARI SEGI LALU LINTAS DAN BIAYA OPERASIONAL KENDARAANUpa, Verdy Ananda; Putri, Bella Fadya
2023-09-18PENGARUH SUBSTITUSI SERBUK CANGKANG KERANG DARAH (ANANDARA GRANOSA) DAN PENAMBAHAN KAPUR TERHADAP PERUBAHAN KUAT TEKAN BETONHusen, Abrar; Syahbetra, Muhammad Fadhil
2023-09-06PENGARUH JAMINAN SOSIAL TERHADAP KINERJA KARYAWAN DENGAN MOTIVASI KERJA SEBAGAI VARIABEL MEDIASI (STUDI KASUS PADA KARYAWAN DI KOTA TANGERANG SELATAN)Theresia, Linda; Dwiananto, Muhamad Rifqi
2023-08-31PEMODELAN TARIKAN PERJALANAN PADA SEKOLAH DASAR DI DESA SURADITA, KECAMATAN CISAUK, KABUPATEN TANGERANG 2022Upa, Verdy Ananda; Sulisiani, Safira
2023-08-18ANALISIS KENDALA PENERAPAN SISTEM MANAJEMEN WAKTU PADA PROYEK TOKYO RIVERSIDE APARTMENTMochtar, Krishna; Adiputra, Yonathan Rizky
2023-09-18PENGARUH PENAMBAHAN CACAHAN GELAS PLASTIK & KAPUR TERHADAP KUAT TEKAN BETON FC’ 35Husen, Abrar; Setiawan, Hendra Aziz
2023-08-10ANALISIS PENGARUH EXIT TOL SAWANGAN TERHADAP KINERJA DAN BIAYA OPERASIONAL KENDARAAN SIMPANG BERSINYAL PADA RUAS JALAN RAYA SAWANGANUpa, Verdy Ananda; Septian, Hendrico
2023-08-23ANALISIS FAKTOR-FAKTOR KETERLAMBATAN PADA PEKERJAAN PIPA PENSTOCK, PROYEK BENDUNGAN JLANTAH KARANGANYAR, JAWA TENGAHYanita, Rachmi; Ghofur, Mohammad
2023-09-15ANALISIS KETERLAMBATAN PEKERJAAN STRUKTUR PROYEK RUMAH TUNGGAL MERUYA DENGAN METODE CPM (CRITICAL PATH METHOD)Mochtar, Krishna; Rosalia, Febby
2023-02-08ANALISIS STABILITAS LERENG MENGGUNAKAN PROGRAM PLAXIS 2DSetiyadi, Rahmat; Febrianto, Raden Yudha Rahmat
2023-08-31ANALISA SIMPANG DIAMOND PADA JALAN TOL CINERE – JAGORAWI DENGAN RUAS JALAN K.H.M.USMAN DI KUKUSAN DEPOK MENGGUNAKAN SOFTWARE VISSIMHakim, Nur; Al Furqon, Muhammad Wima Firdaus
2023-02ANALISIS KENDALA PENERAPAN SISTEM MANAJEMEN WAKTU PADA PROYEK KONSTRUKSI (STUDI KASUS: PROYEK PEMBANGUNAN GEDUNG B KAPAL API OFFICE GAMBIR)Mochtar, Krishna; Cicia, Vivi
2023-08-31ANALISIS PERBANDINGAN EFISIENSI BIAYA DAN WAKTU PEKERJAAN DINDING ANTARA METODE BATA KONVENSIONAL DENGAN PRECASTMochtar, Krishna; Gamulya, Robi
Collection's Items (Sorted by Submit Date in Descending order): 161 to 180 of 230