[TA] Teknik Industri Collection home page

Browse
Subscribe to this collection to receive daily e-mail notification of new additions RSS Feed RSS Feed RSS Feed
Collection's Items (Sorted by Submit Date in Descending order): 101 to 120 of 310
Issue DateTitleAuthor(s)
1999-03-05ANALISIS DAN PERANCANGAN SISTEM INFORMASI MANAJEMEN PENGENDALIAN PENJUALAN JASA PERBAIKAN AC DI BENGKEL AC BAGELANAM, M. Faisal; Nandissa, Bendjamin Ch
1998-05PENELITIAN MENGENAI PROFIL KARYAWAN PERUSAHAAN KECIL SERTA KAITAN SEGMEN-SEGMEN LINGKUNGAN TERHADAP PROFIL KARYAWANDaihani, Dadan Umar; Sabili, M. Muhtadin
1998-01ANALISA PRODUKTIVITAS DI UNIT OPERATION HANDLING PT. GARUDA INDONESIA NGURAH RAI AIRPORT DENPASAR SEBAGAI PENYELENGGARA GROUND HANDLINGDaihani, Dadan Umar; Yuliana, Yuliana
1999-05Analisa Persediaan Bahan Baku Utama Paper Roll Dengan Meiode Q di PT.Indah Kiat Pulp and Paper Coorporntion Serang Mill -- Jawa BaratPandegirot, Geert; Narmaningsih, Nitha Oktaviany
1998-04IDENTIFIKASI FAKTOR-FAKTOR YANG DOMINAN PADA MEKANISME PELAKSANAAN ORGANISASI PERUSAHAAN DI PT. TECO ELEKTRO INDONESIAAritonang, Kinley; Prabudi, Dian
1999-08ANAL/SIS/ BEBAN KERJA MENTAL OPERATOR LABORATORIUM PELLETISASI PEBN - BATAN SERONG - JAWA BARATSutalaksana, Iftikar Z.; Mirady, Dedy
1998-08-15USULAN KEMUNGKINAN PENGGUNAAN KOMPUTERISASI SISTEM PENGENDALIAN PERSEDIAAN DI PT. INTERDELTASembiring, Daniel; Dhafi Z., Reza
1998OPTIMASI PENENTUAN WAKTU PERAWATAN PENCEGAHAN TERHADAP KERUSAKAN MESIN TENUN DI PABRIK KARUNG PLASTIK PT.PUPUK KUJANG (PERSERO)Sembiring, Daniel; Kamali, Musthofa
1994ANALISA PENGARUH VARIABILITAS SELANG WAKTU KERUSAKAN MESIN TERAKHIR PADA SUATU LINTAS ALIR PRODUKSI TERHADAP STRATEGI PENGADAAN PRODUK JADISutalaksana, Iftikar Zahedi; TARIGAN, ANRICO PRIYONGGO
1998-08ANALISIS RANCANGAN PANEL KENDALI DAN ANALISIS PARAMETER FISIK LINGKUNGAN PADA RUANG KENDALI UTAMA INSTALASI THERMO HIDROLIKA DI PPTKR - BATAN SERPONG - JAWA BARATSutalaksana, Iftikar Z.; Gimin, Gimin
1991-07Penentuan Komposisi linyak Daun Cemara (Pinus merkusii) Dengan Cara KromatografiGas dan Spektrometri lassaGirindra, Aisjah; Anwar, Andy Eldhini
1998-02-16ANALISA ALTERNATIF YANG EKONOMIS TERHADAP BUS KAMPUS ANTARA MENYEWA DAN MEMBELI PADA PERGURUAN TINGGI INSTITUT TEKNOLOGI INDONESIANendisa, Bendjamin Ch.; Handoko, Agus Fx.
1998PENGENDALIAN PEMBELIAN BAHAN BAKU UNTUK PROSES PRODUKSI DI PT.XYZNendissa, Bendjamin Ch.; AGUNG, FERRY YULIUS
2023-08-09ANALISIS BEBAN KERJA MENTAL DAN BEBAN KERJA FISIK PADA OPERATOR PRODUKSI MESIN BOILER MENGGUNAKAN METODE NASA – TLX DAN CVL DI PT. TRIMITRA WISESA ABADIWidianty, Yenny; Alamsyah, Ryan
2022-07-26PENGENDALIAN KUALITAS MENGGUNAKAN METODE SIX SIGMA UNTUK MENGURANGI KECACATAN PRODUK PARTISI KANTOR PADA PT. INSPIRA MULTI KARYASudri, Ni Made; Maharani, Alya Muthia
2024-02-28ANALISA BEBAN KERJA MENTAL DAN FISIK KARYAWAN PADA OPERATOR MESIN DI CV. DIRGANTARA JAYATheresia, Linda; Aldiansyah, Muchamad Yusuf
2023-05-06USULAN PENINGKATAN EFISIENSI PROSES PERBAIKAN BUMPER MOBIL DI WORK SHOP BODY REPAIR UTAMA MOTORWidianty, Yenny; Pratama, Yoga
2023-07MENINGKATKAN NILAI PRILAKU LEADER SEBAGAI ROLE MODEL DALAM BUDAYA KERJA POSITIVE DI PT. ASTRA DAIHATSU MOTORSudri, Ni Made; Saputra, Andri
2022-07-27ANALISIS BEBAN KERJA FISIK DAN MENTAL TERHADAP OPERATOR FINISHING DENGAN MENGGUNAKAN METODE NASA – TLX DAN WORK SAMPLING DI PT. PASSION ABADI KORPORASudri, Ni Made; Aprillah, Dwi
2022-11-06USULAN PENINGKATAN NILAI EFEKTIFITAS PADA MESIN GRINDING DI PT.XYZ DENGAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS (OEE)Widianty, Yenny; Siagian, Angel Monika
Collection's Items (Sorted by Submit Date in Descending order): 101 to 120 of 310