Collection's Items (Sorted by Submit Date in Descending order): 81 to 100 of 226
Issue Date | Title | Author(s) |
2023-10-10 | PENINGKATAN KUALITAS UNTUK MENGURANGI CACAT PRODUK XLPE DI PT. SETIA PRATAMA LESTARI PELLETIZING | Dharmawan, Stefanus Rendy; Widianty, Yenny |
2023-04-09 | ANALISA PENERAPAN TOTAL PRODUCTIVE MAINTENANCE PADA WATER TREATMENT PLANT DI PT LESTARI BANTEN ENERGI | Nurdiyansyah, Sigit; Widianty, Yenny |
2023-07-21 | PENINGKATAN MUTU DALAM UPAYA MENGURANGI DEFECT PROCESS PADA PT STRETCHLINE | Melindo, Jovi; Sudri, Ni Made |
2022-08-02 | ANALISIS PENGENDALIAN PERSEDIAAN MENGGUNAKAN METODE ECONOMIC ORDER QUANTITY (EOQ) PADA BAHAN BAKU TINTA TPU WHITE HAP #60 DI PT. AGUNG PELITA INDUSTRINDO | Widianty, Yenny; Baskara, Dava Andika |
2023-08-07 | PENINGKATAN KUALITAS MENGGUNAKAN SIX SIGMA UNTUK MENGURANGI KECACATAN PRODUK SUCTIONT PIPE PT. SAMWON COPPER TUBE INDONESIA | Theresia, Linda; Firmansyah, Muhamad |
2023-10-26 | PERANCANGAN INTERFACE WEBSITE MENGGUNAKAN METODE DESIGN THINKING PADA CV ANTARIKSA GROUP | Herlambang, Mega Bagus; Nurjuniansyah, Rafli |
2023-09-13 | ANALISIS DAN MITIGASI RESIKO SUPPLY CHAIN BAHAN BAKU KOMPONEN KENDARAAN RODA DUA DENGAN METODE HOUSE OF RISK (STUDI KASUS: PT. SAFTA STEEL MANDIRI) | Ni Made Sudri; Ahya, Zul Hammi |
2023-08-21 | ANALISIS PENGENDALIAN PERSEDIAAN BAHAN BAKU DENGAN METODE MATERIAL REQUIREMENT PLANNING (MRP) UNTUK MEMINIMALKAN BIAYA DI PT. TRIMITRA WISESA ABADI | Kurniawan, Laubert |
2023-08-16 | ANALISIS PENGENDALIAN KUALITAS UNTUK MENGURANGI DEFECT PADA PRODUK ABS SHEET DI PT. JINWOO ENGINEERING INDONESIA | Ranti, Gadih; Umam, Khoirul |
2023-09-13 | EVALUASI POSTUR KERJA KARYAWAN PADA OPERATOR PACKING MENGGUNAKAN METODE RULA (RAPID UPPER LIMB ASESSMENT) DAN OWAS (OVAKO WORKING ANALYSIS SYSTEM) DI PT. SETIA PRATAMA LESTARI PELLETIZING | Theresia, Linda; Sabira, Nida |
2023-09-06 | PENINGKATAN KUALITAS KEMASAN PRODUK HERBAL DENGAN METODE SIX SIGMA DAN QUALITY FUNCTION DEPLOYMENT DI PT. XYZ | Theresia, Linda; Rachmawati, Mifti Tri |
2022-09-29 | Perbaikan Metode Kerja Berdasarkan PengukuranBebanKerja Mental Dan Analisa Postur Tubuh PekerjaMenggunakan Metode NASA–TLX Dan Rapid Entire BodyAssessment (REBA) Di Home Industry Keripik Tempe Ubaey | Herlambang, Mega Bagus; Setiabudi, Ardy |
2023-08-10 | ANALISA PENGENDALIAN PERSEDIAAN BAHAN BAKU PLAT BESI PADA PT. SAFTA STEEL MANDIRI | Ni Made Sudri; Firmansyah, Fahru Rois |
2023-08-04 | PENGENDALIAN BAHAN BAKU DENGAN METODE MATERIAL REQUIREMENT PLANNING (MRP) PT XYZ | Theresia, Linda; Khijazi, Mirsyad Ammar |
2023-09-13 | ANALISIS BEBAN KERJA UNTUK MENENTUKAN JUMLAH KARYAWAN YANG OPTIMAL MENGGUNAKAN WORKLOAD ANALYSIS PADA BAGIAN PENGEMASAN SEKUNDER DI PT. DAMI SARIWANA | Theresia, Linda; Dwicaksono, Aprizal Fajri |
2023-08-31 | USULAN JUMLAH TENAGA KERJA PT XYZ DENGAN METODE INDEKS BEBAN KERJA DAN NASA -TLX | Ni Made Sudri; Rahman, Fikih Imam |
2023-08-10 | PENINGKATAN KUALITAS PRODUK BAN PT. XYZ | Ni Made Sudri; Riyansyah, Muhamad |
2023-10-06 | ANALISIS PERBAIKAN METODE KERJA BERDASARKAN POSTUR KERJA DAN BEBAN KERJA MENTAL MENGGUNAKAN METODE RAPID ENTIRE BODY ASSESSMENT (REBA) DAN NASA-TLX DI PT DAMI SARIWANA | Herlambang, Mega Bagus; Iqbal, Muhammad |
2023-07-18 | MENGANALISA RESIKO ERGONOMI DENGAN METODE RAPID ENTIRE BODY ASSESEMENT (REBA), NORDIC BODY MAP (NBM) DAN OVAKO WORKING POSTURE (OWAS) PADA POSTUR TUBUH MEKANIK BENGKEL MOTOR DI CV.CHANDRA MOTORSPORT | Herlambang, Mega Bagus; Prayoga, Mohammad Rafid |
2023-09-06 | PENERAPAN LEAN MANUFACTURING UNTUK MENINGKATKAN EFISIENSI PROSES PRODUKSI (STUDI KASUS PADA PT. JINWOO ENGINEERING INDONESIA) | Theresia, Linda; Zahra, Intan Putri |
Collection's Items (Sorted by Submit Date in Descending order): 81 to 100 of 226