Search


Start a new search
Add filters:

Use filters to refine the search results.


Results 2451-2460 of 2852 (Search time: 0.007 seconds).
Item hits:
Issue DateTitleAuthor(s)
2024-08PENGARUH PERLINTASAN SEBIDANG TERHADAP KINERJA DAN BIAYA OPERASIONAL KENDARAAN PADA SIMPANG MATHLA`UL HUDA PARUNG PANJANGArdiyatna, Fadly; Upa, Verdy Ananda
2024-08-30OPTIMALISASI MANAJEMEN WAKTU DENGAN PENAMBAHAN JAM KERJA (LEMBUR) STUDI KASUS: PROYEK PEMBANGUNAN GEREJA KEMAH TABERNAKEL PIK 2Pratama, Reza Kurnia; Husen, Abrar
2024-08-27ANALISIS KESTABILAN LERENG DENGAN SOIL NAILING PADA SUNGAI CILIWUNG AREA BANGUNAN KOMPLEK KOPASSUS DENGAN MENGGUNAKAN METODE KESETIMBANGAN BATASSatria, Tito Widhi; Hakim, Abi Maulana
2024-08-12ANALISIS PRODUKTIVITAS TENAGA KERJA TERHADAP BIAYA DAN WAKTU PADA PEKERJAAN STRUKTUR BETON GEDUNG IDC DATA CENTERMaharani, Tiara; Husen, Abrar
2024-08-30PERANCANGAN AUTOMATIC PREDICTIVE MAINTENANCE UNIT PART DUMP BODY 777 MENGGUNAKAN PEMROGRAMAN DENGAN METODE WEAR RATE AVERAGE DI PT SANGGAR SARANA BAJAPrimatama, Jufant Bintang Akbar; Herlambang, Mega Bagus
2024-07-25OPTIMASI PREDIKSI TEMPERATUR GEARBOX DENGAN TRANSFORMASI DATA DALAM MACHINE LEARNING UNTUK PREDICTIVE MAINTENANCEShabilli, Andika Mazid; Herlambang, Mega Bagus
2022-08-10USULAN PERBAIKAN PROSES ALIRAN PRODUKSI PLATE FRONT PADA REFRIGERATOR UNTUK MEMINIMALKAN LEAD TIME DENGAN METODE VALUE STREAM MAPPING DI PT. JINWOO ENGINEERING INDONESIABramantya, Farraz Arvind; Ranti, Gadih
2021-08-25Perbaikan Proses Melalui Analisis Pengendalian Kualitas Kemasan Reject Pada Mesin Auto Packing (Cartoning) Di PT. XYZRusdinar, Eka; Herlambang, Mega Bagus
2024-08-01ANALISIS POSTUR KERJA OPERATOR SIGNATURE KRETEK TANGAN DENGAN METODE WERA, REBA DAN RULA DI PR PUTRA MASA DEPANAfif, Muhammad Nur; Theresia, Linda
2021-08-01IMPLEMENTASI LEAN SIX SIGMA UNTUK MEMINIMASI PEMBOROSAN PADA PROSES AKHIR KOMPONEN SUPPORT BOARD DI PT XYZLenoris, Adi; Herlambang, Mega Bagus