Search


Start a new search
Add filters:

Use filters to refine the search results.


Results 2211-2220 of 2857 (Search time: 0.001 seconds).
Item hits:
Issue DateTitleAuthor(s)
2014-01-24SIMULASI SISTEM PENGENDALI LEVEL FLUIDA PADA 2 TANGKI TERHUBUNG SERI (INTERACTING)Saharudin, Saharudin; ; Tyassulissetyo, Tyassulissetyo
2024-06-09PRA-RANCANGAN PABRIK TRIPHENYLPHOSPHINE DENGAN KAPASITAS 3.000 TON/TAHUNHandayani, Sri; Yoshi, Linda Aliffia; Ashari, Cindy; Nugroho, Emanuel Agus
2023-03-10PRA-RANCANGAN INSTALASI PENGOLAHAN AIR LIMBAH PT ANUGRAH ANALISIS SEMPURNA DENGAN KAPASITAS 29.200 M3/TAHUNHandayani, Sri; Pragusna, Danardika Rikasa Tandra
2024PRA-RANCANGAN PABRIK METANOL DARI GAS CO2 DAN H2 KAPASITAS 100.000 TON / TAHUNHandayani, Aniek Sri; Yunus, Ade Lestari; Yanto, Yanto
2024-01-31PRA-RANCANGAN PABRIK BIOGAS DARI TANDAN KOSONG KELAPA SAWIT (TKKS) DENGAN KAPASITAS 100.000.000 m3 /TAHUNWahyudin; Wahyudin; Josephine, Sonyalinda; Syam, Sri Rezki Mardiah
2023-08-24ANALISIS PENGARUH VARIASI TEMPERATUR TEMPERING TERHADAP SIFAT MEKANIS MATERIAL DAN STRUKTUR MIKRO STEEL CASTING LOW ALLOY (A)/ BAJA CHROMIUM PADUAN RENDAH DI PT. KOMATSU INDONESIARupajati, Pathya; Pamungkas, Septiyanto Catur
2024-02-28ANALISA BEBAN KERJA MENTAL DAN FISIK KARYAWAN PADA OPERATOR MESIN DI CV. DIRGANTARA JAYATheresia, Linda; Aldiansyah, Muchamad Yusuf
2024-02-20PRA-RANCANGAN PABRIK ASPIRIN DENGAN KAPASITAS 1.500 TON/TAHUNRatnawati; Naruli, Ezra Zanuardi
2024-01-23IMPLEMENTASI RESTFUL API DENGAN CODEIGNITER FRAMEWORK (STUDI KASUS : SISTEM PPDB)Bramasto, Suryo; Putri, Yasmin Maharani
2023-03-11PRA-RANCANGAN PABRIK PENGOLAHAN AIR LIMBAH DENGAN KAPASITAS SCALE UP 30.000 M3 /TAHUNRatnawati, Ratnawati; Nugraha, Muhamad Trisyan Viky