Search


Start a new search
Add filters:

Use filters to refine the search results.


Results 1471-1480 of 2043 (Search time: 0.004 seconds).
Item hits:
Issue DateTitleAuthor(s)
2024-02-07ANALISIS PRAKIRAAN KEBUTUHAN ENERGI LISTRIK PADA PROVINSI BANTEN SAMPAI TAHUN 2025 MENGGUNAKAN SOFTWARE LEAPSaharudin; Wirayudha, Aldi
2021-02-25PEMBUATAN PAVING BLOCK DENGAN MENGGUNAKAN BAHAN PENGGANTI GEOPOLIMER (FLY ASH) DAN BAHAN TAMBAH SABUT KELAPASetyadi, Rahmat; Intan, Intan
2021-08ANALISA KEKUATAN RANGKA DAN DIMENSI MESIN PERAJANG TEMPE SAGU SISTEM CONVEYOR KAPASITAS 50 KG/JAMHendrawan, Iyus; Apriansyah, Apriansyah
2022-09-18PRA-RANCANGAN PABRIK SILIKON DIOKSIDA DARI ABU BOILER PEMBAKARAN CANGKANG KELAPA SAWIT DENGAN KAPASITAS 10.000 TON/TAHUNHandayani, Aniek Sri; Enjarlis; Astuti, Abigael Angeline Niken Dwi; Fourdian K., JP. Glorialdo; Armayanti A., Nurul Husna
2023-08-27PRA-RANCANGAN PABRIK DIFENILAMIN DARI ANILIN KAPASITAS 100.000 TON/TAHUNSunaryono, Sunaryono; Mulia, Anjas; Narayana, Erik
2023-02-27PRA-RANCANGAN PABRIK BIOGAS DARI LIMBAH KELAPA SAWIT (TKKS - POME) YANG TERINTEGRASI DENGAN PABRIK MINYAK KELAPA SAWIT DENGAN KAPASITAS 1,65 GWH/TAHUN DI KUTAI KARTANEGARASunandar, Kudrat; Pasha, Ridwan
2024-02-01ANALISIS DAMPAK PETIR TERHADAP SISTEM PROTEKSI FISIK DI KAWASAN NUKLIR SERPONGTjahjono, Hendro; Batubara, Rendi Tondi Pandapotan
2023-08-09ANALISIS BEBAN KERJA MENTAL DAN BEBAN KERJA FISIK PADA OPERATOR PRODUKSI MESIN BOILER MENGGUNAKAN METODE NASA – TLX DAN CVL DI PT. TRIMITRA WISESA ABADIWidianty, Yenny; Alamsyah, Ryan
2024-02-06ANALISIS OPTIMALISASI UNIT COMMITMENT PEMBANGKIT LISTRIK TENAGA AIR (PLTA) DENGAN MACHINE LEARNINGLuthfiyani, Ulfah Khairiyah; Marbun, Yosafat
2024-02-06ANALISIS PENYEBAB GANGGUAN PADA JARINGAN DISTRIBUSI LISTRIK MENGGUNAKAN METODE FAULT TREE ANALISYS DAN DATA MINING DI PT.PLN (PERSERO) UP3 DEPOKLuthfiyani, Ulfah Khairiyah; Setyaji, Afiqan Guntara