Search


Start a new search
Add filters:

Use filters to refine the search results.


Results 171-180 of 230 (Search time: 0.003 seconds).
Item hits:
Issue DateTitleAuthor(s)
2022-02-11ANALISIS KENDALA PENERAPAN MANAJEMEN WAKTU PADA PROYEK TOTAL BANGUN PERSADASetiawan, Mifftahul Priyanto; Krishna, Krishna
2022-08-23IDENTIFIKASI FAKTOR-FAKTOR KETERLAMBATAN KONSTRUKSI PADA PROYEK PHLN ISDB TAHAP PELAKSANAAN KONSTRUKSI (STUDI KASUS: PROGRAM NSUP/KOTAKU)Vinasha, Shesia; Mochtar, Krishna
2023-02-11EVALUASI TINGKAT KERUSAKAN PERKERASAN KAKU DENGAN MENGGUNAKAN METODE PAVEMENT CONDITION INDEX (PCI) DAN BINA MARGA PADA RUAS JALAN KOMJEN POL. M. JASIN, KOTA DEPOKDzikri, Ahmad Ihlasul; Setyadi, Rahmat
2022-09-21PENGARUH SUBTITUSI AGREGAT KASAR (KERIKIL) PADA LIMBAH PLASTIK PET (POLYETHYLENE TERPHTHALATE) TERHADAP KUAT TEKAN DAN KUAT LENTUR BETONJunianto, Andrian; Herlina, Riana
2022-12-05KARAKTERISTIK OPERASIONAL ANGKUTAN UMUM SI BENTENG (TERMINALCIMONE – PASAR LAMA)Dermawan, Ahmad Rizki; Hakim, Nur
2024-08ANALISIS PENERAPAN MANAJEMEN WAKTU PADA PROYEK THE CANARY APARTMENTFerdian, Aldo; Mochtar, Krishna
2024-08PENGARUH PERLINTASAN SEBIDANG TERHADAP KINERJA DAN BIAYA OPERASIONAL KENDARAAN PADA SIMPANG MATHLA`UL HUDA PARUNG PANJANGArdiyatna, Fadly; Upa, Verdy Ananda
2024-08-30OPTIMALISASI MANAJEMEN WAKTU DENGAN PENAMBAHAN JAM KERJA (LEMBUR) STUDI KASUS: PROYEK PEMBANGUNAN GEREJA KEMAH TABERNAKEL PIK 2Pratama, Reza Kurnia; Husen, Abrar
2024-08-27ANALISIS KESTABILAN LERENG DENGAN SOIL NAILING PADA SUNGAI CILIWUNG AREA BANGUNAN KOMPLEK KOPASSUS DENGAN MENGGUNAKAN METODE KESETIMBANGAN BATASSatria, Tito Widhi; Hakim, Abi Maulana
2024-08-12ANALISIS PRODUKTIVITAS TENAGA KERJA TERHADAP BIAYA DAN WAKTU PADA PEKERJAAN STRUKTUR BETON GEDUNG IDC DATA CENTERMaharani, Tiara; Husen, Abrar