Please use this identifier to cite or link to this item:
http://repository.iti.ac.id/jspui/handle/123456789/2789| Title: | Analisis Kendala penerapan Manajemen Waktu Pada Proyek Konstruksi. (Studi Kasus : Pembangunan Office PT. Gunung Raja Paksi) |
| Authors: | Adrianto, Wiko |
| Keywords: | Manajemen waktu Kendala Penerapan Manajemen Waktu SPSS |
| Issue Date: | 2024 |
| Description: | Dosen Pembimbing : Prof. Ir. Krishna Mochtar |
| URI: | http://repository.iti.ac.id/jspui/handle/123456789/2789 |
| Appears in Collections: | [TA] Teknik Sipil |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| Full Text Tugas Akhir.docx Restricted Access | FULL TEXT | 16.58 MB | Microsoft Word XML | View/Open Request a copy |
| Daftar Pustaka.pdf | DAFTAR PUSTAKA | 126.29 kB | Adobe PDF | View/Open |
| Cover Tugas Akhir.pdf | COVER | 105.11 kB | Adobe PDF | View/Open |
| BAB V.pdf Restricted Access | BAB V | 134.07 kB | Adobe PDF | View/Open Request a copy |
| BAB IV.pdf Restricted Access | BAB IV | 1.8 MB | Adobe PDF | View/Open Request a copy |
| BAB III.pdf Restricted Access | BAB III | 1.7 MB | Adobe PDF | View/Open Request a copy |
| BAB II.pdf Restricted Access | BAB II | 1.06 MB | Adobe PDF | View/Open Request a copy |
| BAB I.pdf Restricted Access | BAB I | 201.12 kB | Adobe PDF | View/Open Request a copy |
| Abstrak.pdf | ABSTRAK | 206.92 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.