Please use this identifier to cite or link to this item:
http://repository.iti.ac.id/jspui/handle/123456789/2789
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Adrianto, Wiko | - |
dc.date.accessioned | 2025-02-13T04:27:59Z | - |
dc.date.available | 2025-02-13T04:27:59Z | - |
dc.date.issued | 2024 | - |
dc.identifier.uri | http://repository.iti.ac.id/jspui/handle/123456789/2789 | - |
dc.description | Dosen Pembimbing : Prof. Ir. Krishna Mochtar | en_US |
dc.subject | Manajemen waktu | en_US |
dc.subject | Kendala Penerapan Manajemen Waktu | en_US |
dc.subject | SPSS | en_US |
dc.title | Analisis Kendala penerapan Manajemen Waktu Pada Proyek Konstruksi. (Studi Kasus : Pembangunan Office PT. Gunung Raja Paksi) | en_US |
Appears in Collections: | [TA] Teknik Sipil |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Full Text Tugas Akhir.docx Restricted Access | FULL TEXT | 16.58 MB | Microsoft Word XML | View/Open Request a copy |
Daftar Pustaka.pdf | DAFTAR PUSTAKA | 126.29 kB | Adobe PDF | View/Open |
Cover Tugas Akhir.pdf | COVER | 105.11 kB | Adobe PDF | View/Open |
BAB V.pdf Restricted Access | BAB V | 134.07 kB | Adobe PDF | View/Open Request a copy |
BAB IV.pdf Restricted Access | BAB IV | 1.8 MB | Adobe PDF | View/Open Request a copy |
BAB III.pdf Restricted Access | BAB III | 1.7 MB | Adobe PDF | View/Open Request a copy |
BAB II.pdf Restricted Access | BAB II | 1.06 MB | Adobe PDF | View/Open Request a copy |
BAB I.pdf Restricted Access | BAB I | 201.12 kB | Adobe PDF | View/Open Request a copy |
Abstrak.pdf | ABSTRAK | 206.92 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.