Please use this identifier to cite or link to this item: http://repository.iti.ac.id/jspui/handle/123456789/2789
Full metadata record
DC FieldValueLanguage
dc.contributor.authorAdrianto, Wiko-
dc.date.accessioned2025-02-13T04:27:59Z-
dc.date.available2025-02-13T04:27:59Z-
dc.date.issued2024-
dc.identifier.urihttp://repository.iti.ac.id/jspui/handle/123456789/2789-
dc.descriptionDosen Pembimbing : Prof. Ir. Krishna Mochtaren_US
dc.subjectManajemen waktuen_US
dc.subjectKendala Penerapan Manajemen Waktuen_US
dc.subjectSPSSen_US
dc.titleAnalisis Kendala penerapan Manajemen Waktu Pada Proyek Konstruksi. (Studi Kasus : Pembangunan Office PT. Gunung Raja Paksi)en_US
Appears in Collections:[TA] Teknik Sipil

Files in This Item:
File Description SizeFormat 
Full Text Tugas Akhir.docx
  Restricted Access
FULL TEXT16.58 MBMicrosoft Word XMLView/Open Request a copy
Daftar Pustaka.pdfDAFTAR PUSTAKA126.29 kBAdobe PDFView/Open
Cover Tugas Akhir.pdfCOVER105.11 kBAdobe PDFView/Open
BAB V.pdf
  Restricted Access
BAB V134.07 kBAdobe PDFView/Open Request a copy
BAB IV.pdf
  Restricted Access
BAB IV1.8 MBAdobe PDFView/Open Request a copy
BAB III.pdf
  Restricted Access
BAB III1.7 MBAdobe PDFView/Open Request a copy
BAB II.pdf
  Restricted Access
BAB II1.06 MBAdobe PDFView/Open Request a copy
BAB I.pdf
  Restricted Access
BAB I201.12 kBAdobe PDFView/Open Request a copy
Abstrak.pdfABSTRAK206.92 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.