Search


Current filters:
Start a new search
Add filters:

Use filters to refine the search results.


Results 61-70 of 162 (Search time: 0.002 seconds).
Item hits:
Issue DateTitleAuthor(s)
2020USULAN PENERAPAN TOTAL PRODUCTIVE MAINTENANCE (TPM) UNTUK MENINGKATKAN KINERJA MESIN UJI TARIK JTM-200HS HYDRAULIC DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) (STUDI KASUS: BALAI BESAR TEKNOLOGI KEKUATAN STRUKTUR (B2TKS) – BPPT)Lahuddin, Abdul Haris; Silalahi, Rismont Riepoth
2021-09-30USULAN PERBAIKAN KUALITAS MENGGUNAKAN METODE SIX SIGMA UNTUK MENGURANGI JUMLAH CACAT PRODUK FLAKES PET (POLIETILEN TERAFTALAT) CAMPURAN PADA PT TRIDI OASIS GROUPLahuddin, Abdul Haris; Sidik, Muhamad Razif
2020-01USULAN MENINGKATKAN EFEKTIVITAS PADA MESIN FONT MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT XYZLahuddin. Abdul Haris; Alan, Noer Muhammad
2020-09-16USULAN PERBAIKAN KUALITAS GUNA MENGURANGI CACAT DOMINAN PADA PROSES PRODUKSI GIBOULT JOINT DENGAN PENDEKATAN SIX SIGMA DI PT XYZLahuddin, Abdul Haris; Larasati, Ariny Parama
2021-09USULAN PERBAIKA MENGGUNAKAN METODE SIX SIGMA DENGAN PENDEKATAN (DMAIC) UNTUK MENGURANGI JUMLAH DEFECT PRODUKSI MEMBER SUB ASSY PADA PT. DHARMA POLIMETALLahuddin, Abdul Haris; Alkhady, Muhammad Egie
2020-07USULAN PENINGKATAN KUALITAS PRODUK MI INSTAN DENGAN PENDEKATAN SIX SIGMA (STUDI KASUS: PT. XYZ)Lahuddin, Abdul Haris; Piyani, Eka
2020-08-04USULAN PERBAIKAN UNTUK MENGURANGI WASTE PADA PRODUKSI OUTSOLE SEPATU MENGGUNAKAN LEAN MANUFACTURING DENGAN METODE VALUE STREAM MAPPING (VSM) DI CV CITRA TECH FOOTWARELahuddin, Abdul Haris; Ferdiyansah, Alfan
2021-08-18IMPLEMENTASI LEAN SIX SIGMA DALAM PENINGKATAN KUALITAS UNTUK MENGURANGI PRODUK CACAT PADA END REAR SUSPENSION D20N DI PT. INTERMESINDO FORGING PRIMASudri, Ni Made; Alvionita, Rizky
2021-07-15USULAN PENDEKATAN LEAN MANUFACTURING UNTUK ELIMINASI WASTE PADA PRODUKSI END REAR SUSPENSION D87A DENGAN MENGGUNAKAN METODE WASTE ASSESSMENT MODEL (WAM) DAN VALUE STREAM ANALYSIS TOOLS (VALSAT) DI PT. INTERMESINDO FORGING PRIMASudri, Ni Made; Annisa, Hindun
2020USULAN PENERAPAN TOTAL PRODUCTIVE MAINTENANCE (TPM) DALAM MENINGKATKAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) MESIN ROVING FL2 DI DEPARTEMEN SPINNING PT. UNITEX TBKCh. Nendissa, Bendjamin; Assyiddiqi, Hasbi