Search


Start a new search
Add filters:

Use filters to refine the search results.


Results 2851-2860 of 2912 (Search time: 0.004 seconds).
Item hits:
Issue DateTitleAuthor(s)
2023-01ANALISIS BEBAN KERJA DENGAN PENDEKATAN FISIOLOGIS MEKANIK MENGGUNAKAN METODE CARDIOVASCULAR LOAD (CVL) DI UPT PERLENGKAPAN DAN PERBENGKELAN DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA TANGERANGTito Andika, Oki; Bagus Herlambang, Mega
2024-08PRA-RANCANGAN PABRIK MINYAK ASIRI DARI DAUN CENGKIHEnjarlis, Enjarlis; Putri Andhisa, Dhiyah; Nur Hidayat, Wahyu
2025-08RANCANG BANGUN SISTEM PENJUALAN MERCHANDISE BERBASIS WEB PADA GASKUY ENTERTAINMENTMaulana Nurul Hiksal, Muhammad; Indriasari, Melani
2025USULAN PENERAPAN METODE SIX SIGMA UNTUK MENINGKATKAN PRODUKTIVITAS DAN EFISIENSI PROSES PRODUKSI LEMBARAN ABS (ABS SHEET) DI PT JINWOO ENGINEERING INDONESIARahman, Ariful; Merdikawati, Silvia
2024-08ANALISIS PENGARUH BEBAN KERJA MENTAL DAN FISIK PADA KINERJA OPERATOR WELDING WATER TANK DENGAN METODE NASATLX DAN CVL DI PT SANGGAR SARANA BAJATricahayana Putri, Berlian; Theresia, Linda
2025PENERAPAN STRATEGI LEAN MANUFACTURING DALAM MENINGKATKAN PRODUKTIVITAS PRODUKSI Plate Front C (STUDI KASUS PT JINWOO ENGINEERING INDONESIA)Rafi Mumtaz, Abdul; Made Sudri, Ni
2025-09ANALISIS KENDALA PENERAPAN SISTEM MANAJEMEN WAKTU PADA PROYEK APARTEMEN CREATIVO TOWER DAN PMJ LAND TOWERTheresia Marbun, Juliana; Husen, Abrar
2025-08ANALISIS KINERJA PROSES PRODUKSI UNTUK MENINGKATKAN EFEKTIVITAS DAN EFISIENSI PERUSAHAAN MANUFAKTUR DENGAN BERDASARKAN PENDEKATAN SUPPLY CHAIN MANAGEMENT (STUDI KASUS PT. INDONESIA STANLEY ELECTRIC)Bahari Pamungkas, Aziz; Merdikawati, Silvia
2021-02PERENCANAAN PLTS ON GRID 50 KWP DI STADION SPORT CENTER KELAPA DUAWasis Permono, Eko; Palaloi, Sudirman
2025-05PENERAPAN METODE FIFO (FIRST-IN FIRST-OUT) UNTUK PENGENDALIAN PERSEDIAAN BAHAN BAKU PRODUKSI STYROFOAM (STUDI KASUS PT. GOSYEN PACIFIC SUKSES MAKMUR)Zidan, Zaky Maulana; Merdikawati, Silvia