Search


Start a new search
Add filters:

Use filters to refine the search results.


Results 2841-2850 of 2912 (Search time: 0.004 seconds).
Item hits:
Issue DateTitleAuthor(s)
2025-08PRA-RANCANGAN PABRIK METANOL DARI GAS HIDROGEN DAN KARBON DIOKSIDA DENGAN KAPASITAS 125.000 TON/TAHUNRahmannita, Eristia; Zakia, Zakia; Handayani, Sri
2023-02ANALISA KEKUATAN STRUKTUR PADA WINGS PESAWAT TANPA AWAK YANG TERBUAT DARI MATERIAL KOMPOSITRinaldy Lubis, Rifa; Suastiyanti, Dwita
2017PENERAPAN SISTEM KOGENERASI DI PT TORABIKA EKA SEMESTASujono, Iman; Jatmiko Utomo, Bayu
2022-08PERANCANGAN TURN TABLE PADA MESIN AUTO SEALENT UNTUK BUFFERING PRODUK SECARA OTOMATIS BAGIAN LINE ASSY STUDI KASUS PT. AUTOMOTIVSuastiyanti, Dwita; Randi, Randi
2025-09Pra Rancangan Pabrik Formaldehida dari Methanol dan Udara Melalui Proses Formox Kapasitas 2000 Ton per TahunJoseph Kurniawan, Albertus; Ratnawati, Ratnawati
2025-07RANCANG DAN BANGUN SISTEM INFORMASI INVENTORY BARANG DIGUDANG DENGAN MENGGUNAKAN METODE FIRST-IN FIRST-OUT BERBASIS WEB PADA PT ENERBA TEKNOLOGIYufancua, Valenzka; Bagus Herlambang, Mega
2025-08ANALISIS EFISIENSI BOILER MENGGUNAKAN METODE TIDAK LANGSUNG DAN HEAT RATE PADA PEMBANGKIT LISTRIK TENAGA UAP (PLTU) IPP KALBAR 1 (2X100 MW) UNIT 1Hendra Cahyono, Faris; Victor Tuapetel, Jones
2025-08ANALISIS PERANCANGAN PENGGUNAAN HEAT RECOVERY VENTILATOR PADA AIR HANDLING UNIT FULL FRESH AIR DENGAN PEMANFAATAN UDARA BUANG RUANGAN UNTUK RUANG OPERASI INFEKSIAgustin, Anita; Victor Tuapetel, Jones
2022-08PERANCANGAN JADWAL PERAWATAN MESIN MAKER ROKOK DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) DI PR. PUTRA MASA DEPANDwi Audio Putra, Eldo; Widianty, Yenny
2025-09RANCANG BANGUN SISTEM INFORMASI RESTORAN BERBASIS WEBSITE DENGAN FITUR SELF-ORDER DAN DELIVERY (STUDI KASUS: BONBU INDONESIA)Istikhomah, An Nisa; Sunarto, Sunarto