Search


Start a new search
Add filters:

Use filters to refine the search results.


Results 2441-2450 of 2852 (Search time: 0.005 seconds).
Item hits:
Issue DateTitleAuthor(s)
2024-07-25USULAN PENERAPAN METODE SIX SIGMA DALAM PENINGKATAN KUALITAS UNTUK MEMINIMASI KECACATAN PRODUK KABEL NYM 2 X 1.5 MM DI PT. JEMBO CABLE COMPANY TBKTitoSyahputro, Angga; Sudri, Ni Made
2024-08-26PENGARUH PREVENTIVE MAINTENANCE TERHADAP PERFOMA AIR COOLED CHILLER MCQUAY MCS150IFST4 507 KW DI INSTALASI TEKNOLOGI RADIOISOTOP DAN RADIOFARMAKASetiawan, Helmi Nur Muhammad Zain; Akbar, Ronald
2024-01ANALISA DAN UJI TEKNIS MESIN RETORT UNTUK PRODUKSI BUMBU RENDANGRomadhona, Erik Mubarik; Hendrawan, Iyus
2024-08ANALISIS PENERAPAN MANAJEMEN WAKTU PADA PROYEK THE CANARY APARTMENTFerdian, Aldo; Mochtar, Krishna
2024-02-07USULAN PENINGKATAN EFEKTIVITAS MESIN GRAFFIR MINI CNC ROUTHER 3018-PRO MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS DAN FAULT TREE ANALYSIS DI PT LABBERU INTERNASIONAL JAKARTAMalik, Septian Maulana; Widianty, Yenny
2024ANALISIS PENGUKURAN KINERJA PERUSAHAAN DENGAN PENDEKATAN BALANCED SCORECARD DAN ORGANIZATIONAL CULTURE ASSESSMENT INSTRUMENT ( STUDI KASUS PT.XYZ )Susanto, Aji Arya; Herlambang, Mega Bagus
2024-07-25USULAN PENERAPAN SIX SIGMA DALAM MENGURANGI CACAT SERTA PENINGKATAN KUALITAS TERHADAP PROSES PRODUKSI PACKAGING PADA PROSES MESIN LONGWAYIrawan, Shabrina Putri; Sudri, Ni Made
2024-10-14IMPLEMENTASI METODE OVERALL EQUIPMENT EFFECTIVENNES (OEE) DAN METODE FAILURE MODE AND EFFECT ANALYSIS (FMEA) GUNA MENINGKATKAN EFEKTIVITAS PADA MESIN EXTRUDER 120 – B DI PT. XYZFirdaus, Muhamad Faijan; Widianty, Yenny
2024-08-23USULAN PENINGKATAN KINERJA MESIN FCS HT-450SV MENGGUNAKAN PENDEKATAN METODE OEE DAN SIX BIG LOSSES DI PT. PRIMA KOMPONEN INDONESIAHekal, Musa; Widianty, Yenny
2024-08-29ANALISIS PERBANDINGAN KLASIFIKASI MODEL LINEAR DAN NONLINEAR PADA HASIL GETARAN GEARBOX DARI SENSOR VIBRATION MENGGUNAKAN ALGORITMA MACHINE LEARNINGSudrajat, Vieri; Herlambang, Mega Bagus