Search


Start a new search
Add filters:

Use filters to refine the search results.


Results 1561-1570 of 1976 (Search time: 0.004 seconds).
Item hits:
Issue DateTitleAuthor(s)
2023-10-06ANALISIS PERBAIKAN METODE KERJA BERDASARKAN POSTUR KERJA DAN BEBAN KERJA MENTAL MENGGUNAKAN METODE RAPID ENTIRE BODY ASSESSMENT (REBA) DAN NASA-TLX DI PT DAMI SARIWANAHerlambang, Mega Bagus; Iqbal, Muhammad
2023-07-18MENGANALISA RESIKO ERGONOMI DENGAN METODE RAPID ENTIRE BODY ASSESEMENT (REBA), NORDIC BODY MAP (NBM) DAN OVAKO WORKING POSTURE (OWAS) PADA POSTUR TUBUH MEKANIK BENGKEL MOTOR DI CV.CHANDRA MOTORSPORTHerlambang, Mega Bagus; Prayoga, Mohammad Rafid
2023-08-04PRA-RANCANGAN PABRIK NITROSELULOSA DARI SELULOSA KAPASITAS 15.000 TON / TAHUNHandayani, Sri; Pratama, Afiq Azfar; Indryati, Suci
2023-08-15PRA RANCANGAN PABRIK MINYAK KELAPA DENGAN KAPASITAS PRODUKSI 15.000 TON/TAHUNMarsudi, Sidik; Sagala, Endang Nirwana; Sitorus, Frengky Febrianto
2023-08-10PENINGKATAN KUALITAS PRODUK BAN PT. XYZNi Made Sudri; Riyansyah, Muhamad
2023-09-08RANCANG BANGUN SISTEM PENGESAHAN DOKUMEN MENGGUNAKAN ALGORITMA AES BERBASIS WEBSITEIndriasari, Melani; Abdillah, Muhammad Isa
2023-10-20PENERAPAN STANDAR BRC EDISI TUJUH PADA INDUSTRI WAFER STIK DI PT. XYZAmar, Abu; Nurani, Darti; Sucianto, Dwi
2023-10-19IMPLEMENTASI METODE CONVOLUTION NEURAL NETWORK (CNN) UNTUK IMAGE CAPTIONING BERBAHASA INDONESIA DENGAN INCEPTION V3Soleh, Muhammad; Kusumawati, Esa
2023-09-13ANALISIS BEBAN KERJA UNTUK MENENTUKAN JUMLAH KARYAWAN YANG OPTIMAL MENGGUNAKAN WORKLOAD ANALYSIS PADA BAGIAN PENGEMASAN SEKUNDER DI PT. DAMI SARIWANATheresia, Linda; Dwicaksono, Aprizal Fajri
2023-09-15ANALISIS KETERLAMBATAN PEKERJAAN STRUKTUR PROYEK RUMAH TUNGGAL MERUYA DENGAN METODE CPM (CRITICAL PATH METHOD)Mochtar, Krishna; Rosalia, Febby