Search


Start a new search
Add filters:

Use filters to refine the search results.


Results 1421-1430 of 1976 (Search time: 0.003 seconds).
Item hits:
Issue DateTitleAuthor(s)
2023-08-01ANALISIS EFEKTIVITAS WAKTU DAN EFISIENSI BIAYA PENGGUNAAN TOWER CRANE PADA PROYEK PEMBANGUNAN APARTEMEN UPPER WEST BSDNurcahyo, Muhamad Agung
2023-08-01ANALISIS FAKTOR DOMINAN KETERLAMBATAN PADA PROYEK PEMBANGUNAN WAREHOUSE TAMAN TEKNO TANGERANG SELATANYanita, Rachmi; Candramurni, Nadia
2023-09-04ANALISIS FAKTOR KINERJA WAKTU PADA PROYEK KINGLAND AVENUE TOWER FRITZYanita, Rachmi; Setiawan, Bagas
2023-05-12PRA-RANCANGAN PABRIK ASAM OKSALAT DENGAN KAPASITAS 12.500 TON/TAHUNHusnil, Yuli Amalia; Kuntolaksono, Satrio; Indah, Mega; Jannah, Miftha Huul
2023-06-06PRA-RANCANGAN PABRIK TOCOPHERYL ACETATE DENGAN KAPASITAS 150 TON/TAHUNSulistyati, Is; Yoshi, Linda Aliffia; Gunawan, Firnas Muldiansyah; Kustiyawan, Raden Rafdhillah
2022-12-05PERBAIKAN KESELAMATAN KERJA DAN ANALISIS PRODUKTIVITAS KERJA DI HOME INDUSTRI KERIPIK TEMPE UBAEY MENGGUNAKAN METODE JOB SAFETY ANALYSIS (JSA) DAN WORK SAMPLINGHerlambang, Mega Bagus; Utama, Muhamad Dava Putra
2023-05-03ANALISIS PRODUKTIVITAS DAN BEBAN KERJA MENTAL PADA PEKERJA QUALITY CONTROL DI PT. LIGNO SPECIALTY ADHESIVE MENGGUNAKAN METODE WORK SAMPLING DAN NASA-TLXTheresia, Lindha; Ardiansyah, Rikfan
2023-08-11PRA-RANCANGAN PABRIK MINYAK KELAPA DARI KOPRA KAPASITAS PRODUKSI 5.000 TON/TAHUNHandayani, Sri; Naharuddin
2023-06-21PERANCANGAN SISTEM PENGUKURAN KINERJA PADA PT. ANDALAN PRATAMA INDONUSA DENGAN MENGGUNAKAN METODE BALANCE SCORECARDNi Made Sudri; Edrian, Fa’idh Fadhilah
2022-08-10STUDI KELAYAKAN PEMANFAATAN PEMBANGKIT LISTRIK HYBRID TENAGA SURYA – DIESEL – DAN BATERAI UNTUK MELAYANI KEBUTUHAN LISTRIK DI PULAU BANGKO SULAWESI TENGGARAAl Jabbar, Gusti Rizaldi Ramadhan