Search


Start a new search
Add filters:

Use filters to refine the search results.


Results 841-850 of 2033 (Search time: 0.005 seconds).
Item hits:
Issue DateTitleAuthor(s)
2023-09-12PRA-RANCANGAN PABRIK ASAM ASETIL SALISILAT DENGAN KAPASITAS 4000 TON/TAHUNJoelianingsih, Joelianingsih; Febriyanti, Evita; Izzah, Miftah Aqidatul
2023-09-06PENERAPAN LEAN MANUFACTURING UNTUK MENINGKATKAN EFISIENSI PROSES PRODUKSI (STUDI KASUS PADA PT. JINWOO ENGINEERING INDONESIA)Theresia, Linda; Zahra, Intan Putri
2023-08-29PERANCANGAN PASAR RAKYAT BERCITRA MODERN PASAR BENGKOK - KOTA TANGERANGSoepadminingsih, Hariyanti; Ramadhan, Muhamad Alif Rizky
2023-08-31RANCANG BANGUN APLIKASI DOMPET DIGITAL DENGAN PENUKARAN MATA UANG BERBASIS MOBILEHusni; Prawira, Malvin Kuncoro
2023-08-26RANCANG BANGUN FRONTEND WEBSITE DI KLINIK PRATAMA MONHAL PERSADA DENGAN METODE ATOMIK DESAINIndriasari, Melani; Elwarbi, Kautsar
2023-08-29MODEL MINAT PEMBELIAN ULANG PADA KIRAKIRA KOPIOctasylva, Annuridya Rosyidta Pratiwi; Amalia, Bella
2023-03-07ANALISIS PENERAPAN METODE AHP PADA KEPUTUSAN PEMBELIAN FILM BARRIER STUDI KASUSPT BUKIT MURIA JAYAVindiana, Afina Putri; Seleky, Julian Caroline
2023-10-06ANALISIS PERBAIKAN METODE KERJA BERDASARKAN POSTUR KERJA DAN BEBAN KERJA MENTAL MENGGUNAKAN METODE RAPID ENTIRE BODY ASSESSMENT (REBA) DAN NASA-TLX DI PT DAMI SARIWANAHerlambang, Mega Bagus; Iqbal, Muhammad
2023-07-18MENGANALISA RESIKO ERGONOMI DENGAN METODE RAPID ENTIRE BODY ASSESEMENT (REBA), NORDIC BODY MAP (NBM) DAN OVAKO WORKING POSTURE (OWAS) PADA POSTUR TUBUH MEKANIK BENGKEL MOTOR DI CV.CHANDRA MOTORSPORTHerlambang, Mega Bagus; Prayoga, Mohammad Rafid
2023-08-04PRA-RANCANGAN PABRIK NITROSELULOSA DARI SELULOSA KAPASITAS 15.000 TON / TAHUNHandayani, Sri; Pratama, Afiq Azfar; Indryati, Suci