Search


Current filters:
Start a new search
Add filters:

Use filters to refine the search results.


Results 1-10 of 11 (Search time: 0.003 seconds).
Item hits:
Issue DateTitleAuthor(s)
2021-08USULAN PERBAIKAN TOTAL PRODUCTIVE MAINTENANCE (TPM) UNTUK MENINGKATKAN EFEKTIVITAS MESIN CRUSHER NO 6 MENGGUNAKAN OVERALL EQUIPMENT EFFECTIVNESS (OEE) DAN FAILURE MODE AND EFFECT ANALYSIS (FMEA) (STUDI KASUS : PT TRIDI OASIS GROUP)Yenny Widianty R.W.; Putri, Amanda Gracia
2020-08-01USULAN PENJADWALAN MENGGUNAKAN TOTAL PRODUCTIVE MAINTENANCE (TPM) DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA MESIN CETAK OFFSET DI CV. MEGAH PERTAMA JASINDOLinda Theresia; Rahmawati, Elly
2020PENINGKATAN EFEKTIVITAS MESIN MENGGUNAKAN ANALISA OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN SIX BIG LOSSES (STUDI KASUS: PT XYZ)Mohammad Hardiyanto; Subiarto, Erna
2020USULAN PENERAPAN TOTAL PRODUCTIVE MAINTENANCE (TPM) UNTUK MENINGKATKAN KINERJA MESIN UJI TARIK JTM-200HS HYDRAULIC DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) (STUDI KASUS: BALAI BESAR TEKNOLOGI KEKUATAN STRUKTUR (B2TKS) – BPPT)Lahuddin, Abdul Haris; Silalahi, Rismont Riepoth
2022-11-06USULAN PENINGKATAN NILAI EFEKTIFITAS PADA MESIN GRINDING DI PT.XYZ DENGAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS (OEE)Widianty, Yenny; Siagian, Angel Monika
2024-02-07USULAN PENINGKATAN EFEKTIVITAS MESIN GRAFFIR MINI CNC ROUTHER 3018-PRO MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS DAN FAULT TREE ANALYSIS DI PT LABBERU INTERNASIONAL JAKARTAMalik, Septian Maulana; Widianty, Yenny
2024-10-14IMPLEMENTASI METODE OVERALL EQUIPMENT EFFECTIVENNES (OEE) DAN METODE FAILURE MODE AND EFFECT ANALYSIS (FMEA) GUNA MENINGKATKAN EFEKTIVITAS PADA MESIN EXTRUDER 120 – B DI PT. XYZFirdaus, Muhamad Faijan; Widianty, Yenny
2024-08-23USULAN PENINGKATAN KINERJA MESIN FCS HT-450SV MENGGUNAKAN PENDEKATAN METODE OEE DAN SIX BIG LOSSES DI PT. PRIMA KOMPONEN INDONESIAHekal, Musa; Widianty, Yenny
2023-03-23OPTIMALISASI MESIN POMPA SENTRIFUGAL (API 610) DENGAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS DAN PERHITUNGAN SIX BIG LOSSES PADA PT. PETROTURBOMuhammad, Alvin; Widianty, Yenny
2021-08-01USULAN PERBAIKAN TOTAL PRODUCTIVE MAINTENANCE (TPM) UNTUK MENINGKATKAN EFEKTIVITAS MESIN CRUSHER NO 6 MENGGUNAKAN OVERALL EQUIPMENT EFFECTIVNESS (OEE) DAN FAILURE MODE AND EFFECT ANALYSIS (FMEA) (STUDI KASUS : PT TRIDI OASIS GROUP)Putri, Amanda Gracia; Widianty, Yenny