Search


Current filters:
Start a new search
Add filters:

Use filters to refine the search results.


Results 1-9 of 9 (Search time: 0.002 seconds).
  • previous
  • 1
  • next
Item hits:
Issue DateTitleAuthor(s)
2020-08-24ANALISIS TERMODINAMIKA TERHADAP KINERJA PEMBANGKIT LISTRIK TENAGA GAS DAN UAP (PLTGU)Jones Victor Tuapetel; Silitonga, Patuan Sihol Marito
2020-09ANALISIS RUGI – RUGI GENERATOR KAPASITAS 62,5 MVA PADA PLTU MUARA KARANGHendro Tjahjono; Alfaturrozi, Maghvira Reza
2020-01USULAN MENINGKATKAN EFEKTIVITAS PADA MESIN FONT MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT XYZLahuddin. Abdul Haris; Alan, Noer Muhammad
2021-09-09EFFISIENSI PENGGUNAAN BATU ALAM DAN BATU BUATAN UNTUK JETTY MURA KAMBANGAmar, Abu; Reza, Afdoma Yanda
2020-10-03ANALISIS EFISIENSI PENGGUNAAN ENERGI LISTRIK ANTARA SUPLAY LISTRIK PLN DAN TURBIN GAS GENERATOR DI PT DIAN SWASTATIKA SENTOSA TBK.Utomo, Bayu Jatmiko; Fauzi, Muhamad
2020-01USULAN IMPLEMANTASI TOTAL PRODUCTIVE MAINTENANCE (TPM) DENGAN PERHITUNGAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA MESIN RING SPINNING RY5.360 DI PT.KUMATEXSembiring, Daniel; Zakaria, Christian
2021-12-22ANALISIS PENERAPAN KESEIMBANGAN LINI (LINE BALANCING) PADA PROSES PERAKITAN BEJANA TEKAN GUNA MENINGKATKAN EFISIENSI DENGAN METODE RANKED POSITIONAL WEIGHT DI PT. SURYA BESINDO SAKTIGadih Ranti; Fernando, Fernando
2022-09-19STUDI PERBANDINGAN BIAYA DAN WAKTU PENGGUNAAN PONDASI TIPE TIANG PANCANG (SPUN PILE) TERHADAP BORED PILE PADA PROYEK PEMBANGUNAN GEDUNG B KAPAL API OFFICE GAMBIRHusen, Abrar; Nur Fatimah, Wulan
2023-08-31ANALISIS PERBANDINGAN EFISIENSI BIAYA DAN WAKTU PEKERJAAN DINDING ANTARA METODE BATA KONVENSIONAL DENGAN PRECASTMochtar, Krishna; Gamulya, Robi