Search


Start a new search
Add filters:

Use filters to refine the search results.


Results 421-430 of 2043 (Search time: 0.0 seconds).
Item hits:
Issue DateTitleAuthor(s)
2020USULAN PENERAPAN TOTAL PRODUCTIVE MAINTENANCE (TPM) UNTUK MENINGKATKAN KINERJA MESIN UJI TARIK JTM-200HS HYDRAULIC DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) (STUDI KASUS: BALAI BESAR TEKNOLOGI KEKUATAN STRUKTUR (B2TKS) – BPPT)Lahuddin, Abdul Haris; Silalahi, Rismont Riepoth
2021-09-30USULAN PERBAIKAN KUALITAS MENGGUNAKAN METODE SIX SIGMA UNTUK MENGURANGI JUMLAH CACAT PRODUK FLAKES PET (POLIETILEN TERAFTALAT) CAMPURAN PADA PT TRIDI OASIS GROUPLahuddin, Abdul Haris; Sidik, Muhamad Razif
2020-01USULAN MENINGKATKAN EFEKTIVITAS PADA MESIN FONT MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT XYZLahuddin. Abdul Haris; Alan, Noer Muhammad
2020-09-16USULAN PERBAIKAN KUALITAS GUNA MENGURANGI CACAT DOMINAN PADA PROSES PRODUKSI GIBOULT JOINT DENGAN PENDEKATAN SIX SIGMA DI PT XYZLahuddin, Abdul Haris; Larasati, Ariny Parama
2021-09USULAN PERBAIKA MENGGUNAKAN METODE SIX SIGMA DENGAN PENDEKATAN (DMAIC) UNTUK MENGURANGI JUMLAH DEFECT PRODUKSI MEMBER SUB ASSY PADA PT. DHARMA POLIMETALLahuddin, Abdul Haris; Alkhady, Muhammad Egie
2020-07Studi Kelayakan Perencanaan Bisnis Tambang Aggregat Pada PT. XYZLahuddin, Abdul Haris; Alam, Ebit Nur
2020-07USULAN PENINGKATAN KUALITAS PRODUK MI INSTAN DENGAN PENDEKATAN SIX SIGMA (STUDI KASUS: PT. XYZ)Lahuddin, Abdul Haris; Piyani, Eka
2021-02-23ANALISA PERBANDINGAN KUALITAS DAN KUANTITAS JEMBATAN MENGGUNAKAN ARCH BRIDGE DAN CABLE STAYEDHusen, Abrar; Suwandi, Windie Antasari
2020-08-04USULAN PERBAIKAN UNTUK MENGURANGI WASTE PADA PRODUKSI OUTSOLE SEPATU MENGGUNAKAN LEAN MANUFACTURING DENGAN METODE VALUE STREAM MAPPING (VSM) DI CV CITRA TECH FOOTWARELahuddin, Abdul Haris; Ferdiyansah, Alfan
2021-06-28KAJIAN STRUKTUR RANGKA SPACE TRUSS PADA BANGUNAN BENTANG LEBAR DENGAN MATERIAL BAMBUHusen, Abrar; Irawan, Muhammad Amrulloh Andre