Search


Start a new search
Add filters:

Use filters to refine the search results.


Results 1921-1930 of 2043 (Search time: 0.006 seconds).
Item hits:
Issue DateTitleAuthor(s)
2025-02Rancang Bangun Monitoring Water Treatment Plant Limbah Domestik Untuk Menyiram Tanaman Berbasis Internet of ThingsPrabowo, Angga; Dewi Indraswati, Tris
2024Pengaruh Variasi Arus Flux Cored Arc Welding Terhadap Kekuatan Tarik, Struktur Makro dan Mikro Pada Sambungan Baja SS400Wahyu Illahi, Dimas; Rupajati, Pathya
2024-08PENGARUH VARIASI TEMPERATUR DAN MEDIA PENDINGIN PADA PROSES PACK NITRIDING TERHADAP KEKERASAN DAN STRUKTUR MIKRO PADA BAJA KARBON AISI 1010Ardiansah, Bagus; Kozin, Muhammad
2025RANCANG BANGUN INVENTARISASI ASET PADA INSTITUT TEKNOLOGI INDONESIA BERBASIS WEBAgnes Safitri, Saskya; Sunarto, Sunarto
2025-03-05Rancang Bangun E-Commerce (Studi Kasus Tien Cloth)Gaviota Putra jawanda, Mahesa; Soleh, Muhamad
2025-02PRA-RANCANGAN PABRIK GLISEROL MONOSTEARAT DARI BAHAN BAKU GLISEROL DAN ASAM STEARAT DENGAN KAPASITAS 13.000 TON/TAHUNNurfadillah, Nurfadillah; Fernanda, Reva; Yamin, Arsani; Handayani, Sri
2025-02PRA-RANCANGAN PABRIK MINYAK NILAM (Patchoulli oil) KAPASITAS 130 TON/TAHUNNurhimawati, Intan; Rahmita, Nelsa; Wahyudin, Wahyudin
2024-09PRA-RANCANGAN PABRIK KOLAGEN DARI TULANG SAPI DENGAN KAPASITAS 300 TON/TAHUNWidia Anggasari, Heni; Cinthia Panggabean, Yolanda; Wahyudin, Wahyudin; Ratnawati, Ratnawati
2018-08Rancang Bangun Biosand Filter Untuk Instalasi Pengolahan Air Limbah Menggunakan Arduino Mega 2560Rizky Fatulloh, Thesar; Dewi Indraswati, Tris
2025ANALISIS KEBUTUHAN JEMBATAN PENYEBERANGAN ORANG UNTUK INTEGRASI STASIUN DAN TERMINAL (Studi Kasus : Stasiun Batu Ceper dan Terminal Poris Plawad)Ramadhan, Denno; Hakim, Nur