Search


Current filters:

Start a new search
Add filters:

Use filters to refine the search results.


Results 141-150 of 346 (Search time: 0.003 seconds).
Item hits:
Issue DateTitleAuthor(s)
2020-08ANALISA KEBUTUHAN POMPA DAN SISTEM PERPIPAAN LARUTAN NAOH UNTUK KAPASITAS 20 M3/JAMMaradu Sibarani; Situmorang, Rudolf W
2020ANALISA ALIRAN FLUIDA PADA SEKITAR AIRFOIL NACA 2412 DENGAN VARIASI SUDUT SERANG MENGGUNAKAN COMPUTATIONAL FUIDS DYNAMICJones Victor Tuapetel; Nugratama, Akbar
2020KAJIAN KELAYAKAN POTENSI HUTAN SOLEAR SEBAGAI WISATA MASYARAKAT SETEMPATKusmalinda Madjid; Alfisyahr, Fahrul
2020-08-01USULAN PENJADWALAN MENGGUNAKAN TOTAL PRODUCTIVE MAINTENANCE (TPM) DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA MESIN CETAK OFFSET DI CV. MEGAH PERTAMA JASINDOLinda Theresia; Rahmawati, Elly
2020-08-26USULAN PERBAIKAN SISTEM PERAWATAN PADA SEKSI INJECTION MESIN TOSHIBA IS 100 F-3A DENGAN METODE BOOMER (STUDI KASUS: PT. SURYA TOTO INDONESIA, Tbk.)Mohammad Hardiyanto; Tyas, Yuni Asri Mulyaning
2020IDENTIFIKASI PERBAIKAN LEAN MANUFACTURING DENGAN METODE VSM (VALUE STREAM MAPPING) UNTUK MINIMALISASI WASTE PADA PROSES PRODUKSI HOT LINE PADA PT. SAMWON COPPER TUBE INDNESIA.Mohammad Hardiyanto; Siti, Whilda Apriyani
2020APLIKASI METODA BOOMER PADA MESIN BUILDING TIPE ATB-F5 UNTUK MENINGKATKAN EFEKTIVITAS PRODUKSI BAN PADA PT. GAJAH TUNGGAL TBKMohammad Hardiyanto; Simanungkalit, Juni Rosminita
2020USULAN PENERAPAN PERENCANAAN PERSEDIAAN BAHAN BAKU PRODUK ULTHT19 30 DENGAN METODE MATERIAL REQUIREMENT PLANNING (MRP) di PT. KURABO MANUNGGAL TEXTILEYenny Widianty R.W.; Noviandi, Ari
2020PENGENDALIAN PERSEDIAAN SPARE PART NOZZLE DENGAN METODE MINIMUM MAKSIMUM (MIN-MAX) PADA SEKSI ASSEMBLY DI PT SURYA TOTO INDONESIAGadih Ranti; Widadari, Wulan Ratu
2020-08USULAN PENERAPAN SIX SIGMA GUNA MEMINIMALISIR PRODUK REJECT KACAMATA PLASTIK PADA PROSES PENYEMPROTAN DI PT. ATALLA INDONESIAGadih Ranti; Leonardi, Nico