Browsing by Subject Overall Equipment Effectiveness
Showing results 1 to 10 of 10
| Issue Date | Title | Author(s) |
| 2023-03-23 | OPTIMALISASI MESIN POMPA SENTRIFUGAL (API 610) DENGAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS DAN PERHITUNGAN SIX BIG LOSSES PADA PT. PETROTURBO | Muhammad, Alvin; Widianty, Yenny |
| 2023-08-21 | PENINGKATAN NILAI OVERALL EQUIPMENT EFFECTIVENESS (OEE) MESIN INJEKSI MOLDING FORSTAR 650 TON UNTUK MEMPRODUKSI BATOK ABS OPTIMAX DI PT. POLIPRIMA CIPTA UNGGUL | Rasyid, Mohammad Kurniadi; Hidayat, Sandika |
| 2024 | UPAYA PENINGKATAN EFEKTIVITAS MESIN MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN FAILURE MODE AND EFFECTS ANALYSIS (FMEA) PADA MESIN ROTOGRAVURE | Riyadi, Faizal Akbar |
| 2020-01 | USULAN MENINGKATKAN EFEKTIVITAS PADA MESIN FONT MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT XYZ | Lahuddin. Abdul Haris; Alan, Noer Muhammad |
| 2024-02-07 | USULAN PENINGKATAN EFEKTIVITAS MESIN GRAFFIR MINI CNC ROUTHER 3018-PRO MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS DAN FAULT TREE ANALYSIS DI PT LABBERU INTERNASIONAL JAKARTA | Malik, Septian Maulana; Widianty, Yenny |
| 2024-08-23 | USULAN PENINGKATAN KINERJA MESIN FCS HT-450SV MENGGUNAKAN PENDEKATAN METODE OEE DAN SIX BIG LOSSES DI PT. PRIMA KOMPONEN INDONESIA | Hekal, Musa; Widianty, Yenny |
| 2022-11-06 | USULAN PENINGKATAN NILAI EFEKTIFITAS PADA MESIN GRINDING DI PT.XYZ DENGAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) | Widianty, Yenny; Siagian, Angel Monika |
| 2020-08-01 | USULAN PENJADWALAN MENGGUNAKAN TOTAL PRODUCTIVE MAINTENANCE (TPM) DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA MESIN CETAK OFFSET DI CV. MEGAH PERTAMA JASINDO | Linda Theresia; Rahmawati, Elly |
| 2021-08-01 | USULAN PERBAIKAN TOTAL PRODUCTIVE MAINTENANCE (TPM) UNTUK MENINGKATKAN EFEKTIVITAS MESIN CRUSHER NO 6 MENGGUNAKAN OVERALL EQUIPMENT EFFECTIVNESS (OEE) DAN FAILURE MODE AND EFFECT ANALYSIS (FMEA) (STUDI KASUS : PT TRIDI OASIS GROUP) | Putri, Amanda Gracia; Widianty, Yenny |
| 2021-08 | USULAN PERBAIKAN TOTAL PRODUCTIVE MAINTENANCE (TPM) UNTUK MENINGKATKAN EFEKTIVITAS MESIN CRUSHER NO 6 MENGGUNAKAN OVERALL EQUIPMENT EFFECTIVNESS (OEE) DAN FAILURE MODE AND EFFECT ANALYSIS (FMEA) (STUDI KASUS : PT TRIDI OASIS GROUP) | Yenny Widianty R.W.; Putri, Amanda Gracia |